BAKU, Azerbaijan, July 20. Uzbekneftegaz JSC has completed drilling at well No.363 of the Shurtan field (country’s Kashkadarya region), Trend reports citing the press service of the company.
As a result of the work carried out, an industrial gas flow of 70,000 cubic meters of gas and 1.5 tons of gas condensate per day was obtained.
The Shurtan gas condensate field is located in the Guzar district of the Kashkadarya region and has been developed since 1980.
Previously, Uzbekneftegaz JSC has completed an overhaul at well No.61 of the Kulbeshkak field (country’s Bukhara region)
As a result of the work carried out, an industrial gas flow of 100,000 cubic meters of gas and 1 ton of gas condensate per day was obtained.