BAKU, Azerbaijan, October 22.Uzbekneftegaz JSC completed an overhaul at well No.52 of the Kulbeshkak field (country’s Bukhara region), Trend reports via the company's statement.
As a result of the work carried out, an industrial gas flow of 70,000 cubic meters of gas and 0.7 tons of gas condensate per day was obtained.
The Kulbeshkak gas condensate field is located on the territory of the Karakul district of the Bukhara region and was put into operation in 2008.
Previously, Uzbekneftegaz JSC completed an overhaul at well No.51 of the Khodjikazgan field (the country’s Bukhara region).
As a result of the work carried out, an industrial gas flow of 150,000 cubic meters of gas and 1.5 tons of gas condensate per day was obtained.