BAKU, Azerbaijan, November 23. Uzbekneftegaz JSC completed repair and insulation work at well No.77 of the Doyakhotin field (country’s Bukhara region), Trend reports via the company's statement.
As a result of the work carried out, an industrial gas flow of 50,000 cubic meters of gas and 0.5 tons of gas condensate per day was obtained.
The Doyakhotin gas condensate field is located in the Karakul district of the Bukhara region and was put into operation in 2004.
Previously, Uzbekneftegaz JSC completed the overhaul at well No.38 of the Uchkir field (Bukhara region).
As a result of the complex workover, an industrial gas flow of 56,000 cubic meters of gas and 0.5 tons of gas condensate per day was obtained.